Help develop MALONI Mini.

MALONI Mini is now the priority of our own development. CAD V2.1, dated 12 November 2026, awaits physical assembly and validation. We welcome discussions with development and industrial partners; no production date or investment return is promised.

CAD V2.1 — before physical assembly

Concept illustration — MALONI Mini
Concept illustration with a rectangular display and a separate camera above it, not a prototype photograph. The “safe materials” wording embedded in the image is an unverified design intention. Suitability for children has not been established.

Documented project status

According to documentation supplied by Rostislav Sikora, Mini is at CAD V2.1, revision dated 12 November 2026. Physical assembly, AI functionality and suitability for children have not been verified. The technical V1 page below describes the historical Humanoid 120 concept.

V1 concept and technology →

9 November 2026 to 9 May 2027

Historical Humanoid 120 validation and fundraising plan

This is the original Humanoid 120 plan, preserved as history. Its dates, milestones and simulation results do not apply to MALONI Mini. The next Mini steps are documented in the current development diary.

  1. November to December

    Scope and supplier estimates

    Completed
    Confirmed on

    The V1 scope and initial bill of materials are ready. HELIOS submitted a turnkey proposal covering 3D design, manufacturing drawings, the requested parts and assembly.

  2. December to January

    Simulation and costing

    Completed ahead of schedule
    Confirmed on

    The concept and control design are ready. MALONI 120 runs as a standalone robot in the virtual showroom nearly a month ahead of the original plan. The validation report covers simulated driving, braking and emergency stopping. Supplier costs and in-house work are tracked separately.

  3. January to February

    Investor and pilot discussions

    Approach hardware investors and manufacturing partners. Interview schools and education centres about pilot needs.

  4. February to March

    Bench validation

    Check critical parts and demonstrate electronics and control on a test rig if funds permit.

  5. March to April

    Due diligence

    Review supplier evidence, the milestone budget and ownership of the design and software with interested investors.

  6. April to May

    Financing decision

    Agree investment terms if a suitable partner is found. Release the build budget once financing is secured.

Rostislav Sikora

Project lead and primary contact

Led by Rostislav Sikora.

Rostislav Sikora leads MALONI’s own development and has made Mini its current priority. He is the primary contact for development partners, investors and prospective collaborators.

Rostislav Sikora’s professional profile →
Rostislav Sikorarostislav.sikora@maloni.cz+420 775 625 664MALONI Mini

Investment discussions

For Mini, the next step is mechanical fit validation using actual components. Any budget, financing and cooperation terms will be discussed individually with Rostislav Sikora after the technical scope is agreed.